Home
Previous
Projects
Process
Information
Contact

 

 

BREVARD COLLEGE- MOORE SCIENCE BUILDING ANNEX


Project description:  Phase 1 of a 2-phase, 3-story building.  Phase1 is a temporary expansion of the existing Science Building.  The goal of the College is to eventually build a new Science Building and convert this building to another use.   All decisions with this first phase were made with Phase 2 in mind.  The building design is to be as generic and flexible as possible.  There is negligible demolition required for the Phase 2 work.

Project location:  Campus of Brevard College, Brevard, N.C.

 

 

site3.gif (23282 bytes)

Jan-10-'0256.jpg (23247 bytes)

1STFLO2b.jpg (18947 bytes)

1STFLO2a.jpg (20012 bytes)

Site Plan

Exterior- Pre-Construction

Exterior-
Rendering

Rendering From
Courtyard

 

Construction Photos, October, 2002

BrevColl_Oct30'02_02.jpg (28749 bytes)

BrevColl_Oct30'02_03.jpg (21607 bytes)

BrevColl_Oct30'02_05.jpg (13299 bytes)

BrevColl_Oct30'02_06.jpg (18827 bytes)

BrevColl_Oct30'02_07.jpg (13064 bytes)

South Exterior

View of 
Southeast Corner

Interior
Hallway

Classroom
Interior

Lab
Interior

 

 

CAMILLE-ALBERICE ARCHITECTS, P.A.
12 SOUTH LEXINGTON AVE.
SUITE 100
ASHEVILLE, N.C.  28801
TEL (828) 251-5550
FAX (828) 251-1465