EMMA ELEMENTARY SCHOOL: ADDITIONS AND RENOVATIONS


61,000 SF total new construction and renovation.  New classrooms, offices, cafeteria, and assembly hall.  Renovation of existing classrooms, library, and gymnasium.  Project completed and opened to students in August, 1996, on schedule.

Project team:  

Architects: 
Peter Alberice, AIA, Principal Architect in charge
Robert  Camille, Jr.,
Robert Todd, AIA.  

Consultants: 
Brittain Engineering, Inc. (Plumbing, Mechanical/Electrical)
Delta Engineering, Inc. (Structural)
General Contractor:  Jerry Payne Construction Co.
Plumbing Contractor:  Bolton Corp.
Mechanical Contractor: Price Piping Company, Inc.
Electrical Contractor: Circle-F Electrical. 

Project Description:

First Buncombe County school to utilize a pre-cast, hollow core concrete floor system.  Reduced foundation costs, exterior wall costs, saving $35,000, and shortened construction time by three weeks.  Open, simple, flexible classrooms that meet or exceed state requirements, featuring ample natural light.  Two separate buildings connected by exterior breezeways were converted into a single building with enclosed interior corridors.  Successfully converted four obsolete open-plan classrooms to a new media center.  Split-faced concrete masonry units incorporating school colors within color scheme.  Insulating stucco system and aluminum-framed insulated windows will reduce long term heating and cooling costs.  Long term growth and flexibility accommodated.  First Buncombe County school to use site-built light gauge metal roof trusses in response to client's request for sloped roofs over new and existing flat-roofed buildings.  This reduced construction time, preventing interruption of classes, and reduced long-term roofing costs.  Visual cohesiveness was created between old and new construction.  Architectural grade roofing shingles permit maintenance by school staff. 

School location:  37 Brickyard Rd. Asheville, NC  28806, (828) 232-4272.

Start date:  April, 1996.

Completion date:  August, 1997.

Contact:  

Ms. Margaret Edwards, Former Principal Emma Elementary School, (828) 645-6054.
Mr. Curtis Taylor, Project Manager, Jerry Payne Construction, (828) 281-4400.


EmmaKids1A.jpg (26334 bytes)

EmmaSite_20081211_C.gif (86131 bytes)

EmmaFoldingTable.jpg (20347 bytes)

EmmaTrusses1.jpg (28332 bytes)

EmmaFront2.jpg (12132 bytes)

Multi-Purpose Space

Site Plan

Folding Table
In Multi-Purpose Space

New Aluminum 
Roof Trusses

Exterior 

 

EmmaSlabs2.jpg (20214 bytes)

EmmaFront3.jpg (13731 bytes)

EmmaSlabs.jpg (20556 bytes)

EmmaFront1.jpg (22906 bytes)

Setting Hollow Floor Slabs, 1

Exterior View

Setting Hollow Floor Slabs, 2

Exterior, Front

 

Emma_4.gif (54439 bytes)

EmmaSide1.jpg (18638 bytes)

EmmaBefore1.jpg (17738 bytes)

EmmaParkinglot1.jpg (17816 bytes)

Plan Drawing

Side View

Exterior, Before Construction

Exterior View

 

EmmaDoors.jpg (18890 bytes)

EmmaTrusses2.jpg (19427 bytes)

EmmaLibrBefore.jpg (26412 bytes)

EmmaLibrAfter.jpg (27049 bytes)

New Doors

Setting Trusses

 Library, Before Construction

Library, After Construction