EMMA ELEMENTARY SCHOOL: ADDITIONS AND RENOVATIONS
61,000 SF total new construction and
renovation. New classrooms,
offices, cafeteria, and assembly hall. Renovation of existing
classrooms, library, and gymnasium. Project completed and opened to
students in August, 1996, on schedule.
Project team:
Architects:
Peter Alberice, AIA, Principal Architect in charge
Robert Camille, Jr.,
Robert Todd, AIA.
Consultants:
Brittain Engineering, Inc. (Plumbing, Mechanical/Electrical)
Delta Engineering, Inc. (Structural)
General
Contractor: Jerry Payne Construction Co.
Plumbing
Contractor: Bolton Corp.
Mechanical Contractor: Price Piping Company, Inc.
Electrical Contractor:
Circle-F Electrical.
Project Description:
First Buncombe County school to utilize
a pre-cast, hollow core concrete floor system. Reduced
foundation costs, exterior wall costs, saving $35,000, and shortened
construction time by three weeks. Open, simple, flexible classrooms that
meet or exceed state requirements, featuring ample natural light.
Two separate buildings connected by
exterior breezeways were converted into a single building with
enclosed interior corridors. Successfully converted four obsolete
open-plan classrooms to a new media center. Split-faced concrete masonry units
incorporating school colors within color scheme. Insulating stucco system and
aluminum-framed insulated windows will reduce long term heating and
cooling costs. Long term growth and flexibility
accommodated. First Buncombe County school to use
site-built light gauge metal roof trusses in response to client's
request for sloped roofs over new and existing flat-roofed
buildings. This reduced construction time, preventing
interruption of classes, and reduced long-term roofing costs.
Visual cohesiveness was created between old and new
construction. Architectural grade roofing shingles permit
maintenance by school staff.
School location:
37 Brickyard Rd. Asheville, NC 28806, (828) 232-4272.
Start date:
April, 1996. Completion
date: August, 1997.
Contact:
Ms. Margaret Edwards, Former Principal Emma Elementary School, (828)
645-6054.
Mr. Curtis Taylor, Project Manager, Jerry Payne Construction, (828)
281-4400.

|
|

|

|

|
|
Multi-Purpose Space
|
Site Plan
|
Folding Table
In Multi-Purpose Space
|
New Aluminum
Roof Trusses
|
Exterior
|

|

|

|

|
|
|
Setting Hollow Floor Slabs, 1
|
Exterior View
|
Setting Hollow Floor Slabs, 2
|
Exterior, Front
|
|
|

|

|

|
|
Plan Drawing
|
Side View
|
Exterior, Before Construction
|
Exterior View
|
|

|

|

|

|
|
New Doors
|
Setting Trusses
|
Library, Before Construction
|
Library, After Construction
|
|