Home
Previous
Projects
Process
Information
Contact

 

 

KARL STRAUS TRACK AND FIELD FACILITY- UNC ASHEVILLE CAMPUS


The project is comprised of three separate buildings- a Restroom and Press Box Building , a Concessions Building and a Timing and Storage Building .  The facilities are designed to serve the Track and Field Complex and the Baseball Complex.  In addition, the project includes accessible Bleachers to seat 537 spectators.  Low maintenance exterior materials have been incorporated including stone and brick exterior walls and metal roofs.  A Solar hydronic heating system will be employed to continue UNC Asheville’s desire to be more environmentally responsible.

Project location:  Campus of University of North Carolina- Asheville.

Projected Completion date:  Summer, 2009.

Project Team:

Peter Alberice, AIA- Principal Architect in charge
Peter Looper, AIA
Rusty Morrow

 

UNCA_05.jpg (162189 bytes) UNCA_01.jpg (145162 bytes) UNCA_03.jpg (182211 bytes)

 
UNCA_02.jpg (162652 bytes) UNCA_04.jpg (205471 bytes)


 

CAMILLE-ALBERICE ARCHITECTS, P.A.
12 SOUTH LEXINGTON AVE.
SUITE 100
ASHEVILLE, N.C.  28801
TEL (828) 251-5550
FAX (828) 251-1465